Addressing the unseen threat to excavation
The challenge: Deep excavations in high water tables
In the UAE, deep basements are often constructed well below the groundwater table. Whether you are using secant piles, diaphragm walls, or sheet piles, water ingress is a constant threat.
Why shoring leaks are dangerous:
Loss of ground: As water flows through a gap in the piles, it carries fine sand and silt with it. This creates large voids behind the shoring wall.
Settlement risk:
The ground loss causes settlement in the adjacent zone, threatening neighboring towers, roads, and utilities (the "zone of influence").
Project delays: Flooded excavation pits stop work, requiring expensive and continuous dewatering that can draw down the water table further, exacerbating the problem.
Common Leak Points:
- Clutch interlocks: Gaps in sheet pile clutches due to hard driving or declutching.
- Pile overlap: "Shadows" or gaps between male/female secant piles where verticality tolerances were missed.
- Tie-back anchors: Water tracking along ground anchors or soil nails.

How can Geobear help?
Geobear's water sealing treatment is an ideal, non-excavation alternative to traditional methods. Instead of digging from the outside, we inject a fluid geopolymer from within the excavation.
This solution has a number of key benefits:
Seals water leaks
Our geopolymer flows into cracks and voids, then rapidly expands to form a solid, waterproof mass. This immediately stops the water flow.
Improves the ground
The geopolymer also densifies the surrounding soil, strengthening the ground and helping to prevent future ingress.
Is up to 70% faster
The entire process can be completed in a fraction of the time it would take to excavate and repair from the outside.
No additional excavation
Solution does not require full excavation of site or water removal prior to works.
Key benefits for contractors
Stops running sand
Goebear's solution seals the leak AND locks the soil particles together, preventing further ground loss.
No excavation
We inject through the wall or from the surface. No need to dig behind the shoring.
Speed
We can seal a major leak in hours, allowing your excavation to proceed safely the next day.
Chemical resistance
Our materials are resistant to the high chloride and sulfate content of UAE groundwater.
Water entering your excavation?
Don't risk ground collapse. Contact our emergency response team to stop the leak now.