Explore our successful projects for road, rail, airport, and port infrastructure, focusing on extending asset life.
Softened clay soils beneath a wing wall caused movement and loss of support, threatening structural stability and long‑term performance.
Voids within the shaft and annulus at Shugborough Tunnel on the West Coast Main Line posed risks to structural integrity and rail safety.
Voids beneath a busy railway track threatened stability and safety, requiring urgent remediation without disrupting train services or excavating the ...
Subsurface voids beneath infrastructure at Colt Cragg Reservoir posed risks to stability and long‑term asset performance in a sensitive water ...
Significant voiding developed beneath a dive site in Bermondsey, threatening ground stability and structural safety in a constrained urban ...
Rocking concrete slabs caused vibration, operational disruption and safety concerns, requiring stabilisation without removing or replacing the ...
Ground instability and settlement affected the docks approach road, requiring stabilisation to maintain safe heavy vehicle access without disrupting ...
Critical infrastructure required ground stabilisation in constrained conditions, demanding a precise solution that minimised disruption to operations ...
Canal bank instability and erosion threatened structural integrity and surrounding infrastructure, requiring remediation without draining the canal ...
Ground instability and water ingress threatened the performance and integrity of a cofferdam during installation, requiring rapid stabilisation to ...
Voids were identified beneath infrastructure at Tunstall Reservoir, posing risks to structural stability and long‑term asset performance in a ...
Settlement and loss of support beneath the bridge approach created uneven levels and structural concerns, requiring stabilisation without major ...
To discuss a site issue or arrange a site visit, please get in touch.