Overview
The ground surrounding utilities infrastructure is constantly at risk from water ingress, soil erosion, and changing ground conditions. This can lead to voiding around pipes, manholes, and cable trenches, causing settlement and structural instability.
The traditional method to this repair involves excavating roads and land, leading to significant disruption to services and the public.Geobear offers a different approach. We design a solution that involves the injection of a self-expanding, specially engineered resin directly into the ground through small, 12-16mm holes. This process fills voids, compacts the surrounding soil, and helps to re-level structures. Our methods are up to 70% faster and have a 75% lower carbon impact than traditional alternatives, allowing you to maintain operations while we work
Challenges Geobear can solve
Sewer ground strengthening
Remediate structural movement affecting water, gas, and sewer pipes.
Water sealing
We provide a rapid solution to reduce permeability and help seal against water ingress, which can lead to further erosion and voiding.
Void filling around pipes and conduits
We fill washouts and voids in the subgrade, restoring the integrity of the ground supporting buried pipes and cables.
Sub-station ground improvement
We improve the ground to provide a stable foundation, protecting assets from movement and damage.
Manhole stabilisation and re-levelling
We strengthen the ground beneath and surrounding manholes, and can lift them back to their correct level, preventing further settlement.
Case studies
Baker Street sewer stabilisation
A road and sewer system experienced severe settlement of 100–200 mm following flash flooding.
Sewer pipe belly lifting
Using Geobear solution to lift sewer pipes on a new-build estate.
Provost Driver Court dewatering support
Geobear delivered a complex ground improvement and water-sealing scheme in Renfrew.
Geobear solution vs. alternative methods
|
Feature |
The Geobear Solution |
Traditional Underpinning/Piling |
|
Disruption |
Minimal. No excavation needed. Operations can often continue. |
High. Requires major excavation and site closure. |
|
Speed |
Up to 70% faster. Work is completed in days, not weeks or months. |
Slow. Can take weeks or months to complete. |
|
Carbon Impact |
Low. Up to 75% lower carbon impact than concrete-based methods. |
High. Uses heavy machinery and concrete. |
|
Access |
Small, truck-based rig. Can access difficult or confined urban spaces. |
Requires large, heavy machinery. |
|
Method |
Geobear solutions delivered through micro-injections. |
Requires deep digging and extensive civil works. |
Accreditations
Geobear is a trusted partner with a commitment to quality and safety. We are accredited with HAPAS certification, a rigorous standard for products used on UK highways. We are also the only company in our sector to have BBA approval.
Geobear is a trusted partner with a commitment to quality and safety.
We are accredited with HAPAS certification, a rigorous standard for products used on UK highways. We are also the only company in our sector to have BBA approval.
Key benefits to working with Geobear
Minimise business disruption
Our non-invasive process means you can often continue operations while we work, avoiding costly downtime and public inconvenience.
Get a specific, engineered plan
Our in-house engineers design a unique solution for every project, using decades of expertise to create the best outcome.
A commitment to sustainability
Our low-carbon solution helps you meet your environmental targets without compromising on quality or performance.
Trusted and proven
With over 200,000 projects under our belt, our methods have been tested and refined for more than 40 years.
Speed and responsiveness
We can mobilise our teams quickly to address urgent ground problems, keeping your assets operational and safe.
FAQs
Discuss your site with geobear
Contact us to have on of our regional managers visit your site.