Utilities
Challenge
Several newly installed sewers developed pipe bellies due to weak alluvial soils, preventing utility adoption — traditional excavation repairs would have caused major disruption to occupied estate roads.
Solution
Geobear injected expanding geopolymers beneath five sewer sections, compacting soils, lifting pipes back into alignment, and restoring gradients — completed in 8 days with zero road closures.
        Precision lift achieved
To the network flow
Faster than relining
On a new housing development in the North West, post-installation CCTV surveys revealed that several sewer lines beneath estate roads had developed pipe bellies. These defects, identified by standing water within the sewers, were the result of settlement in weak underlying soils.
The sewers were founded above 7–10 m of very soft alluvium, offering little natural support. Over time, ground weakness caused sections of pipe to sag, creating hydraulic inefficiencies and blocking adoption of the assets by the local utility provider.
Five separate locations across the estate required urgent remediation to reinstate the long-term stability of the sewers while keeping the roads fully operational.
The engineering challenges were clear:
Geobear designed and implemented a precision geopolymer injection scheme across the five defect locations.
This approach enabled effective correction of the pipe bellies while minimising disruption for residents.
Geobear process leaves minimal evidence in road way other than small holes that are subsequently grouted.

This image is taken from the monitoring unit and illustrates the pipe belly where residual water is no longer present.