Our proven infrastructure projects

Explore our successful projects for road, rail, airport, and port infrastructure, focusing on extending asset life.

Nottingham EZ1 – void filling and stabilisation

Nottingham EZ1 – void filling and stabilisation

Voids and weakened ground beneath the EZ1 development in Nottingham caused settlement risk, requiring rapid stabilisation without disruptive ...

Permeation grouting – flood defence scheme, Otley

Permeation grouting – flood defence scheme, Otley

Weak and permeable ground conditions threatened the integrity of a flood defence scheme, requiring ground strengthening and reduced permeability ...

Peterhead Port – settlement stabilisation

Peterhead Port – settlement stabilisation

Settlement at operational port infrastructure in Peterhead threatened structural performance and required stabilisation without disrupting critical ...

Port of Hernesaari – internal erosion control

Port of Hernesaari – internal erosion control

Internal erosion within port structures threatened long‑term stability and durability, requiring ground improvement and seepage control without ...

Rail ballast binding - targeted geopolymer injection

Rail ballast binding - targeted geopolymer injection

Loose railway ballast reduced track stability and increased maintenance requirements, creating a need to improve stiffness and load distribution ...

Rail embankment badger sett void filling

Rail embankment badger sett void filling

Badger sett activity within a rail embankment created voids and instability, posing a risk to track support and requiring remediation without ...

Rail transition zone ground improvement

Rail transition zone ground improvement

Differential settlement and stiffness mismatches at the UBC4 rail transition caused recurring twist faults, yet Irish Rail needed a fast, ...

Stabilisation of a road in Reading

Stabilisation of a road in Reading

Road settlement created uneven carriageway levels, affecting ride quality and requiring stabilisation works with minimal traffic disruption on a live ...

Road bridge abutment strengthening and void filling

Road bridge abutment strengthening and void filling

Voids and weakened ground beneath a road bridge abutment threatened stability, requiring strengthening works without disrupting traffic or ...

M61 Duckworth stabilisation

M61 Duckworth stabilisation

Ground instability beneath sections of the M61 at Duckworth reduced support to carriageway infrastructure, requiring stabilisation without extended ...

M42 – Geobear saves money keeping UK’s roads running

M42 – Geobear saves money keeping UK’s roads running

Settlement and voiding beneath the M42 carriageway required remediation to maintain safety and performance while avoiding prolonged closures and high ...

M42 and M54 slab stabilisation

M42 and M54 slab stabilisation

Concrete slab sections on the M42 and M54 experienced loss of support and voiding, requiring stabilisation without extended lane closures or major ...

Discuss your site with Geobear

To discuss a site issue or arrange a site visit, please get in touch.

Bear pointing Bear pointing