Challenge

Critical infrastructure required ground stabilisation in constrained conditions, demanding a precise solution that minimised disruption to operations and surrounding assets.

Solution

Geobear deployed engineered geopolymer injection to stabilise and strengthen ground conditions quickly, delivering structural improvement with minimal excavation or operational impact.

Infrastructure stabilised

Ground performance enhanced

Minimal operational disruption

Works completed alongside live assets

Fast installation

Reduced programme duration

Background

Infrastructure assets often face settlement, voiding or weakening ground conditions due to ageing materials, water ingress or changing loads.

Traditional remediation methods can involve excavation, service interruption and extended closures, increasing cost and risk.

Challenge

The project required stabilisation works within a sensitive infrastructure environment, where access was limited and operational continuity was essential.

A solution was needed that could be delivered safely, efficiently and without major disruption.

Solutions

Geobear implemented a carefully designed geopolymer injection programme tailored to the specific site constraints.

The expanding resin filled voids, strengthened weak soils and improved load‑bearing performance beneath the structure.

Injection works were completed with minimal surface disturbance and controlled in real time.

Results

The infrastructure was successfully stabilised and ground conditions enhanced, extending asset life and reducing future maintenance risk.

The solution provided a faster, less disruptive alternative to traditional methods.