Our proven infrastructure projects

Explore our successful projects for road, rail, airport, and port infrastructure, focusing on extending asset life.

Soft Clay Stabilisation

Soft Clay Stabilisation

Geobear stabilised 600 m² of very soft clay at Kinfauns Drive, Glasgow, using expansive geopolymer injection. Achieved a 780% increase in shear ...

M11 Emergency Ground Strengthening

M11 Emergency Ground Strengthening

Geobear stabilised voided soils at the M11 Jct 14 Girton Interchange with geopolymer injection. Completed in 3 weeks vs 8 weeks excavation, achieving ...

A323 Clay Shrinkage Road Stabilisation

A323 Clay Shrinkage Road Stabilisation

Geobear delivered the UK’s first geopolymer road project on the A323. Shrinkable clay was stabilised to depths of 3.5 m, avoiding excavation and ...

Highways Concrete Bay Stabilisation

Highways Concrete Bay Stabilisation

Geobear stabilised 150 concrete bays on a dual carriageway with geopolymer injection. The scheme cut 326.7 tCO₂e (62% reduction) and was delivered in ...

Shugborough Tunnel Void Filling & Lining

Shugborough Tunnel Void Filling & Lining

Geobear filled hidden shafts and lining voids in Shugborough Tunnel with geopolymer injection. Completed in 40 night possessions, delivering a ...

Concrete Railway Level Crossing Stabilisation

Concrete Railway Level Crossing Stabilisation

Geobear stabilised a 90 mph level crossing on the near Swineshead station using geopolymer injection. In one weekend possession, formation stiffness ...

Rail Transition Zone Ground Improvement

Rail Transition Zone Ground Improvement

Geobear stabilised the UBC4 rail transition zone with geopolymer injection. Post-treatment monitoring showed a 59–69% reduction in twist faults and ...

Discuss your site with Geobear

To discuss a site issue or arrange a site visit, please get in touch.

Bear pointing Bear pointing