The ground surrounding utilities infrastructure is constantly at risk from water ingress, soil erosion, and changing ground conditions. This can lead to voiding around pipes, manholes, and cable trenches, causing settlement and structural instability.

The traditional method to this repair involves excavating roads and land, leading to significant disruption to services and the public.Geobear offers a different approach. We design a solution that involves the injection of a self-expanding, specially engineered resin directly into the ground through small, 12-16mm holes. This process fills voids, compacts the surrounding soil, and helps to re-level structures. Our methods are up to 70% faster and have a 75% lower carbon impact than traditional alternatives, allowing you to maintain operations while we work

Challenges Geobear can solve

Sewer ground strengthening

Remediate structural movement affecting water, gas, and sewer pipes.

Water sealing

We provide a rapid solution to reduce permeability and help seal against water ingress, which can lead to further erosion and voiding.

Void filling around pipes and conduits

We fill washouts and voids in the subgrade, restoring the integrity of the ground supporting buried pipes and cables.

Sub-station ground improvement

We improve the ground to provide a stable foundation, protecting assets from movement and damage.

Manhole stabilisation and re-levelling

We strengthen the ground beneath and surrounding manholes, and can lift them back to their correct level, preventing further settlement.

Case studies

Three Geobear techs at a construction site in a rail yard

Baker Street sewer stabilisation

A road and sewer system experienced severe settlement of 100–200 mm following flash flooding.

geobear on new build estate

Sewer pipe belly lifting

Using Geobear solution to lift sewer pipes on a new-build estate.

Infra case provost

Provost Driver Court dewatering support

Geobear delivered a complex ground improvement and water-sealing scheme in Renfrew.

Geobear solution vs. alternative methods

Feature

The Geobear Solution

Traditional Underpinning/Piling

Disruption

Minimal. No excavation needed. Operations can often continue.

High. Requires major excavation and site closure.

Speed

Up to 70% faster. Work is completed in days, not weeks or months.

Slow. Can take weeks or months to complete.

Carbon Impact

Low. Up to 75% lower carbon impact than concrete-based methods.

High. Uses heavy machinery and concrete.

Access

Small, truck-based rig. Can access difficult or confined urban spaces.

Requires large, heavy machinery.

Method

Geobear solutions delivered through micro-injections.

Requires deep digging and extensive civil works.

Accreditations

Geobear is a trusted partner with a commitment to quality and safety. We are accredited with HAPAS certification, a rigorous standard for products used on UK highways. We are also the only company in our sector to have BBA approval.

Geobear is a trusted partner with a commitment to quality and safety.

We are accredited with HAPAS certification, a rigorous standard for products used on UK highways. We are also the only company in our sector to have BBA approval.

Key benefits to working with Geobear

Minimise business disruption

Our non-invasive process means you can often continue operations while we work, avoiding costly downtime and public inconvenience.

Get a specific, engineered plan

Our in-house engineers design a unique solution for every project, using decades of expertise to create the best outcome.

A commitment to sustainability

Our low-carbon solution helps you meet your environmental targets without compromising on quality or performance.

Trusted and proven

With over 200,000 projects under our belt, our methods have been tested and refined for more than 40 years.

Speed and responsiveness

We can mobilise our teams quickly to address urgent ground problems, keeping your assets operational and safe.

FAQs

A Geobear solution is designed by engineers and features the injection of expanding geopolymer resin into the ground. It is used to fill voids, compact soil, and lift subsided structures.

Most projects are completed in a matter of days, compared to the weeks or months required for traditional methods like piling or mass concrete. The area is typically ready for use just 15 minutes after treatment.

Yes. Our solutions have up to a 75% lower carbon impact than traditional methods. They do not involve excavation or the use of large, energy-intensive machinery.

In many cases, yes. Our non-intrusive method allows us to work around existing infrastructure with minimal disruption, avoiding the need for service shutdowns.