Re-level sinking floor slabs without stopping operations

Geobear uses geopolymer resin injection to improve ground and resolve sinking floor issues, often without stopping operations.

Trusted by:
31s

How do we resolve sinking slabs in just 2 days?

We treat the soil under your home, stabilising the ground, closing cracks and resolving your subsidence issue.

Over 32,000 commercial slab lifting projects completed over the past 40 years

Slab lifting

Why use Geobear re-levelling solution?

No excavation, no plant, no site compound — racking, machinery and stock stay where they are

Works isolated to a few square metres; the rest of your floor keeps running around us

Small mobile injection unit, dust-free and no wet trades — suitable for live food, pharma and clean environments

Load-bearing in 15 minutes — forklifts back on the slab the same day, not after a 28-day cure

Treats the ground, not the symptom, so it doesn't resettle in three years

Why choose Geobear?

200,000+ successful projects since 1983

Geobear has completed thousands of projects globally across every ground type and sector, specialising in floor subsidence, commercial buildings, retail, office, infrastructure and residential solutions.

Work directly with slab re-levelling experts

Our team of experts and chartered engineers works alongside you providing suitability analysis, detailed quotes, advanced site diagnostics, geotechnical analysis, bespoke treatment plans.

100+ year design life — you fix it once

Geobear re-levelling solution not only raises floor slabs, it is a permanent solution, filling voids and improving the underlying ground.

On site within days, anywhere in the UK

Geobear operates across the UK and Ireland and provide emergency slab stabilisation & void filling treatments with 24 hr service.

Independently certified for quality and performance

Geobear is ISO 14001, ISO 9001 and ISO 45001 certified and we hold BBA and HAPAS certifications.

Every treatment validated up to ±0.25mm precision

Laser level monitoring is used throughout to ensure agreed lift, flatness and levelness are within tolerances (including TR34 if required) are met before project signoff.

Speak to a slab levelling expert

Jon Chevin BEng (Hons) FICE

Jon specialises in commercial floor and slab lifting, particularly for logistics, production facilities and warehousing. He can provide engineering advice on project requirements and suitable solutions.

Contact us for a technical consultation to see how our proven, in-house expertise can resolve concrete floor subsidence with minimal disruption to operations.

Screenshot 2025-11-27 at 15.05.47

Geotechnical diagnostics: Pre-remediation assessment

Prior to commencement, our engineering team conducts a rigorous site assessment to characterise the subsurface profile and identify the primary mechanisms of settlement. Utilizing precision laser-level surveys, we quantify settlement patterns and establish baseline topography. We evaluate structural loading requirements—including racking configurations, machinery specifications, and dynamic traffic loads—to determine the root cause of ground instability, whether resulting from poorly compacted fill, sub-grade erosion, or insufficient bearing capacity. Operational constraints, such as site access requirements and business continuity needs, are integrated into the preliminary site plan.

View of Geobear techs working on installing injection tubes in a concrete slab with tools in background.

Engineered remediation strategy: Bespoke structural stabilisation

Recognising that settlement drivers are site-specific, we eschew standardised approaches in favour of tailored injection methodologies. Synthesising data from the site assessment, we design a targeted resin injection array that optimises the volume, depth, and spatial geometry of the treatment points. This engineering-led approach restores soil bearing capacity and slab elevation to specified structural tolerances, adhering to rigorous ground improvement standards without the disruption of traditional excavation. The design explicitly accounts for operational continuity, ensuring critical infrastructure remains functional throughout the remediation process. These approaches, along with our market leading experience and expertise in ground engineering, ensure that Geobear remains the world's most trusted geopolymer injection contractor.

Laser level receiver on a stand at home subsidence treatment

Validation and verification protocols

Our commitment to structural integrity extends beyond the injection phase, utilising active monitoring throughout the process to ensure precision and prevent slab overcorrection. Upon completion, we implement comprehensive post-remediation verification, including secondary laser-level surveys to confirm that structural elevations are restored to design tolerances—achieving precision thresholds of 0.25mm where required for automated systems or high-bay storage. We provide full technical documentation and verification records, ensuring complete transparency and adherence to engineering specifications.

Frequently asked questions

Our process is extremely fast. Most projects are completed in a matter of days, not months. Because the geopolymer material cures in just 15 minutes, floors are often ready for traffic immediately after we finish an area, minimising downtime.

In most cases, no. Our material is injected through small diameter holes drilled directly through the slab. This surgical approach means we can often work around racking, machinery, and furniture, saving you the huge operational cost of emptying your facility.

Yes. Our geopolymer materials are engineered to be incredibly strong and durable. They are specifically designed to compact and strengthen the ground beneath the slab, increasing its load-bearing capacity to easily support heavy-duty operations, including forklift traffic and machine bases.

Our process is exceptionally clean. Unlike traditional concrete work, there is no excavation involved. This makes it ideal for sensitive environments like offices, retail stores, and food production facilities.

Restore your floors. Protect your operations.

Don't let sinking floors disrupt your business. Contact our expert team for a site assessment and a clear plan to restore safety and efficiency with minimal downtime.

Bear pointing Bear pointing