The silent threat to your commercial property

Unstable ground can lead to sinking floors, cracked walls, and structural damage, creating a direct threat to tenant safety, business operations, and your property's value.

For shopping mall operators and office managers in the UAE, traditional repairs mean noisy construction, dust, and closed stores—a nightmare for revenue and tenant relations. Geobear provides a trusted, modern alternative that solves the problem at its source, often while the building sleeps.

Ground engineering challenges we solve

Settlement and foundation instability

We resolve the root cause of structural movement and cracking by strengthening the weak ground supporting your building, often caused by loose sand or local washouts.

Sinking and uneven floors

We can re-level floors to eliminate trip hazards and restore a safe, professional environment for staff and customers.

Void filling and ground improvement

We are experts at filling voids caused by washouts from leaking fire mains or AC drainage, restoring structural integrity from the ground up.

Weak ground strengthening

We can improve the load-bearing capacity of the ground, a crucial step for building extensions or installing heavy new equipment or displays.

How our solutions keep your space operational

Our geopolymer injection process is installed without the use of heavy excavation equipment. Our teams use hand-held tools and can access small service corridors or back-of-house areas easily.

Geobear techs injecting geopolymer in side of building foundation

No disruption to tenants or customers

Our work is discreet and non-invasive. We can schedule work between 2 AM and 8 AM (outside typical mall operating hours), meaning your tenants and customers will never even know we were there.

Overlooking a retail store shelves from an elevated viewpoint.

Minimal need to vacate or move stock

We work through small holes drilled through the floor and foundation into the soil below. This allows us to treat areas without needing to clear out office furniture, retail fixtures, or stock rooms.

Illustration depicting geopolymer injected under a concrete slab into soil (binding the soil) in a retail backroom.

Immediate results

The material cures in just 15 minutes, meaning floors and stabilised areas are safe to be used almost immediately after we finish, eliminating costly downtime.

A Geobear expert sitting at a desk conducts a video visit with a client. Their computer screens are visible as the expert talks.

Why work with Geobear

Expert in-house engineering

Our specialist team designs the optimal solution, providing you with a single, accountable partner from start to finish. We understand local regulations and compliance requirements.

Operational flexibility

We work around your business needs, scheduling in sections or after hours to ensure zero disruption, with discreet and professional delivery.

Reliable, proven, & sustainable

As the inventors of the process, our solutions are trusted worldwide to solve complex ground issues without major excavation. Our solutions have a significantly lower carbon footprint—up to 60% less than traditional methods like underpinning.

FAQ

Your questions, answered

Here are the answers to the most common queries we receive from property managers, business owners, and engineers about our solutions for commercial buildings.

No. Our process is designed to be non-disruptive. We can schedule work outside of operating hours or phase the treatment to allow your business to continue running without interruption.

Virtually none. There is no excavation, and our process is very clean. We work through small, pre-drilled holes, eliminating the dust and debris associated with traditional methods.

In most cases, no. We can work around existing fixtures, desks, and shelving, saving you the significant time and effort of clearing the space.

When you factor in the avoidance of business interruption, our solution is significantly more cost-effective. Projects are typically completed in a matter of days, not the weeks or months required for underpinning.

Yes, our process is ideal for sensitive structures. It is non-invasive and precisely controlled, making it the preferred solution for preserving the integrity of historic buildings.

Yes. We can inject through grout lines in tiled floors or under carpet tiles, ensuring that expensive finishes are preserved or easily reinstated.

Almost immediately. Our geopolymer material reaches 90% of its strength in just 15 minutes, meaning floors can be walked on and spaces can be reoccupied as soon as we finish.

Protect your business today

Don't let unstable ground threaten your business or asset value. Contact our commercial team for a no-obligation site assessment and a clear proposal to resolve your issue.

Bear pointing Bear pointing