Explore our successful projects for road, rail, airport, and port infrastructure, focusing on extending asset life.
Sudden road settlement created a safety risk and required urgent stabilisation to prevent further deterioration, without prolonged road closure or ...
Embankment instability and loss of ground strength threatened infrastructure performance, requiring reinforcement without large‑scale excavation, ...
Embankment instability along a heritage railway threatened track integrity and required ground strengthening without major excavation or prolonged ...
Settlement of hardstanding at Dover Docks created uneven surfaces and operational risk within a critical port environment, requiring rapid ...
Voids had developed around a culvert structure at an operational substation, creating stability risks and requiring remediation without disrupting ...
Concrete pavement bays between M54 Junctions 3 and 2 were experiencing settlement and loss of support, creating ride quality issues and requiring ...
Void formation and water ingress beneath a canal towpath caused surface instability and erosion risk, requiring stabilisation without excavation or ...
Void formation and reduced ground support beneath a live rail platform required strengthening without excavation or disruption to passenger services.
Ground movement behind a rail wingwall caused cracking and loss of support, requiring stabilisation without excavation or disruption to rail ...
Settlement of concrete road slabs in Bath city centre created uneven surfaces and safety concerns, requiring stabilisation within a constrained urban ...
Void formation beneath hardstanding at Barking substation risked asset stability and operational resilience, requiring ground improvement without ...
Voids beneath the A83 carriageway caused localised instability and safety concerns, requiring rapid ground stabilisation on a key strategic route ...
To discuss a site issue or arrange a site visit, please get in touch.