Culvert void fill – Derby substation, Sowter Road

Culvert void fill – Derby substation, Sowter Road

Voids had developed around a culvert structure at an operational substation, creating stability risks and requiring remediation without disrupting ...

Concrete bay stabilisation – M54 J3–J2

Concrete bay stabilisation – M54 J3–J2

Concrete pavement bays between M54 Junctions 3 and 2 were experiencing settlement and loss of support, creating ride quality issues and requiring ...

Canal towpath void filling and water sealing

Canal towpath void filling and water sealing

Void formation and water ingress beneath a canal towpath caused surface instability and erosion risk, requiring stabilisation without excavation or ...

Bristol Temple Meads platform strengthening

Bristol Temple Meads platform strengthening

Void formation and reduced ground support beneath a live rail platform required strengthening without excavation or disruption to passenger services.

Bookham Wingwall stabilisation

Bookham Wingwall stabilisation

Ground movement behind a rail wingwall caused cracking and loss of support, requiring stabilisation without excavation or disruption to rail ...

Bath City Centre road slabs

Bath City Centre road slabs

Settlement of concrete road slabs in Bath city centre created uneven surfaces and safety concerns, requiring stabilisation within a constrained urban ...

Barking substation stabilisation and void filling

Barking substation stabilisation and void filling

Void formation beneath hardstanding at Barking substation risked asset stability and operational resilience, requiring ground improvement without ...

A83 void filling and stabilisation

A83 void filling and stabilisation

Voids beneath the A83 carriageway caused localised instability and safety concerns, requiring rapid ground stabilisation on a key strategic route ...

A55 slab stabilisation

A55 slab stabilisation

Concrete pavement slabs on the A55 had settled due to sub‑base voiding and loss of support, requiring rapid stabilisation without extended closures ...

A180 Croxton Holding scheme

A180 Croxton Holding scheme

Decades‑old A180 concrete slabs were sinking due to sub‑base washout and heavy traffic, degrading ride quality and compromising safety; a fast, ...

A55 J35–J34 Westbound pavement slab stabilisation

A55 J35–J34 Westbound pavement slab stabilisation

Concrete pavement slabs on the A55 westbound between J35 and J34 had settled due to sub‑base washout, requiring rapid stabilisation without extended ...

A47 Bretton Subway, Peterborough

A47 Bretton Subway, Peterborough

Geobear delivered targeted geopolymer injection beneath the affected carriageway to fill voids, improve subgrade strength and re‑level slabs during ...