M42 and M54 slab stabilisation
Concrete slab sections on the M42 and M54 experienced loss of support and voiding, requiring stabilisation without extended lane closures or major traffic disruption.
Voids and sinkholes are a serious and often unseen issue beneath our most critical infrastructure. If left unchecked, they can lead to ground instability, causing infrastructure to move. Geobear provides a fast, precise, and non-disruptive void-filling that restores ground stability before failures occur.
Our void-filling solutions are designed to address urgent ground failures or areas in need of void filling such as disused pipes, tunnels, culverts or voids created by badger setts. Our solutions address:
Voids cause a loss of support beneath concrete.
Burrowing animals cause structural movement, Geobear fills the voids providing stability.
Visible holes or sudden collapse requiring immediate remediation.
Soil loss from poor drainage or flooding creating voids beneath infrastructure.
Our void filling and sinkhole solutions are applied across critical infrastructure, including:
Geobear’s geopolymer injection system provides a rapid, sustainable solution for filling voids and stabilising ground.
Our no-dig approach allows assets to remain operational while we work.
Expanding resins fill every cavity and compact surrounding soils, ensuring complete fill and stabilisation.
Materials cure in minutes, enabling hand-back in hours.
Up to 75% less carbon than concrete-based alternatives.
Every site is unique, so our engineers start with a detailed survey and design a detailed treatment plan tailored to your project. This will specify exactly where the geopolymer is to be injected and at what level and in what quantities. Geobear has a range of 22 different geopolymers which have differing performance characteristics, the engineers will choose the one which is best suited for your project.
Depending on the void, the geopolymer is installed via small diameter temporary steel tubes, which are drilled into the ground to the required depth - or we mass fill voids pumping directly from a hose. The geopolymer is pumped in liquid form which then rapidly expands in-situ into a hardened material with specific engineering properties.
The expansion fills the voids and compacts any loose materials which might be present. The reaction profile of the geopolymer is very quick in comparison to cementitious grouts, gaining 90% of its compressive strength within 15 minutes and then fully cured within 1 hour.
Throughout the process, we monitor movement and pressure in real time using lasers and CCTV; ensuring precision, control, and reliable results. Specified performance can be measured via in situ penetration testing.
Geobear has delivered urgent void filling and sinkhole remediation throughout the UK. Examples include:
Concrete slab sections on the M42 and M54 experienced loss of support and voiding, requiring stabilisation without extended lane closures or major traffic disruption.
Geobear stabilised hidden construction shafts and tunnel lining voids at Shugborough Tunnel with geopolymer injection.
Geobear filled voids behind Swanage’s Grade II listed sea wall with inert geopolymer resin. The solution reinstated ground support.
Geobear delivered rapid void filling solution beneath the M11 at Junction 14, avoiding collapse risk.
Don’t wait for a hidden void to become a major failure. Speak to our engineers today for a rapid, safe, and effective void-filling solution.