Explore our successful projects for road, rail, airport, and port infrastructure, focusing on extending asset life.
Voids beneath a busy railway track threatened stability and safety, requiring urgent remediation without disrupting train services or excavating the ...
Subsurface voids beneath infrastructure at Colt Cragg Reservoir posed risks to stability and long‑term asset performance in a sensitive water ...
Significant voiding developed beneath a dive site in Bermondsey, threatening ground stability and structural safety in a constrained urban ...
Voids were identified beneath infrastructure at Tunstall Reservoir, posing risks to structural stability and long‑term asset performance in a ...
Loose railway ballast reduced track stability and increased maintenance requirements, creating a need to improve stiffness and load distribution ...
Differential settlement and stiffness mismatches at the UBC4 rail transition caused recurring twist faults, yet Irish Rail needed a fast, ...
Ground instability and settlement affected the docks approach road, requiring stabilisation to maintain safe heavy vehicle access without disrupting ...
Canal bank instability and erosion threatened structural integrity and surrounding infrastructure, requiring remediation without draining the canal ...
Ground instability and water ingress threatened the performance and integrity of a cofferdam during installation, requiring rapid stabilisation to ...
Settlement and loss of support beneath the bridge approach created uneven levels and structural concerns, requiring stabilisation without major ...
Critical infrastructure required ground stabilisation in constrained conditions, demanding a precise solution that minimised disruption to operations ...
Voids and weakened ground beneath the EZ1 development in Nottingham caused settlement risk, requiring rapid stabilisation without disruptive ...
To discuss a site issue or arrange a site visit, please get in touch.