Our proven infrastructure projects

Explore our successful projects for road, rail, airport, and port infrastructure, focusing on extending asset life.

Road bridge abutment strengthening and void filling

Road bridge abutment strengthening and void filling

Voids and weakened ground beneath a road bridge abutment threatened stability, requiring strengthening works without disrupting traffic or ...

M61 Duckworth stabilisation

M61 Duckworth stabilisation

Ground instability beneath sections of the M61 at Duckworth reduced support to carriageway infrastructure, requiring stabilisation without extended ...

M42 – Geobear saves money keeping UK’s roads running

M42 – Geobear saves money keeping UK’s roads running

Settlement and voiding beneath the M42 carriageway required remediation to maintain safety and performance while avoiding prolonged closures and high ...

M42 and M54 slab stabilisation

M42 and M54 slab stabilisation

Concrete slab sections on the M42 and M54 experienced loss of support and voiding, requiring stabilisation without extended lane closures or major ...

Lewisham gateway void filling

Lewisham gateway void filling

Voids were identified beneath ground slabs at Lewisham Gateway, compromising support and posing a risk to surface stability in a busy urban ...

Leaking river wall sealed

Leaking river wall sealed

Water ingress through a leaking river wall caused voiding and ground instability behind the structure, requiring rapid sealing and stabilisation to ...

Kentish town slab track treatment

Kentish town slab track treatment

Void formation beneath slab track at Kentish Town reduced support and risked track instability, requiring remediation within a live railway ...

Ground improvement works for Tynybryn bridge

Ground improvement works for Tynybryn bridge

Weak and variable ground conditions beneath Tynybryn Bridge required strengthening to ensure long‑term structural stability without extensive ...

Ground improvement and stabilisation to support new sewer beneath motorway

Ground improvement and stabilisation to support new sewer beneath motorway

Construction of a new sewer beneath a live motorway required ground improvement to ensure stability and load performance without disrupting traffic ...

Ground improvement on a major A road

Ground improvement on a major A road

Weak underlying soils beneath a major A road caused settlement and reduced pavement performance, requiring stabilisation without extended lane ...

Geobear stabilises and improves soils at aging dock

Geobear stabilises and improves soils at aging dock

Ageing dock infrastructure experienced ground deterioration and loss of support, requiring soil improvement to maintain operational safety without ...

Farnham rail depot

Farnham rail depot

Ground instability and settlement required remediation to protect structural performance, without invasive excavation or prolonged disruption to the ...

Discuss your site with Geobear

To discuss a site issue or arrange a site visit, please get in touch.

Bear pointing Bear pointing