Stabilisation of canal bank

Stabilisation of canal bank

Canal bank instability and erosion threatened structural integrity and surrounding infrastructure, requiring remediation without draining the canal ...

Stabilising cofferdam installation for United Utilities

Stabilising cofferdam installation for United Utilities

Ground instability and water ingress threatened the performance and integrity of a cofferdam during installation, requiring rapid stabilisation to ...

Tunstall Reservoir, County Durham – void filling

Tunstall Reservoir, County Durham – void filling

Voids were identified beneath infrastructure at Tunstall Reservoir, posing risks to structural stability and long‑term asset performance in a ...

Newham Hill bridge approach – ground improvement

Newham Hill bridge approach – ground improvement

Settlement and loss of support beneath the bridge approach created uneven levels and structural concerns, requiring stabilisation without major ...

Nottingham EZ1 – void filling and stabilisation

Nottingham EZ1 – void filling and stabilisation

Voids and weakened ground beneath the EZ1 development in Nottingham caused settlement risk, requiring rapid stabilisation without disruptive ...

Permeation grouting – flood defence scheme, Otley

Permeation grouting – flood defence scheme, Otley

Weak and permeable ground conditions threatened the integrity of a flood defence scheme, requiring ground strengthening and reduced permeability ...

Peterhead Port – settlement stabilisation

Peterhead Port – settlement stabilisation

Settlement at operational port infrastructure in Peterhead threatened structural performance and required stabilisation without disrupting critical ...

Port of Hernesaari – internal erosion control

Port of Hernesaari – internal erosion control

Internal erosion within port structures threatened long‑term stability and durability, requiring ground improvement and seepage control without ...

Rail ballast binding - targeted geopolymer injection

Rail ballast binding - targeted geopolymer injection

Loose railway ballast reduced track stability and increased maintenance requirements, creating a need to improve stiffness and load distribution ...

Rail embankment badger sett void filling

Rail embankment badger sett void filling

Badger sett activity within a rail embankment created voids and instability, posing a risk to track support and requiring remediation without ...

Rail transition zone ground improvement

Rail transition zone ground improvement

Differential settlement and stiffness mismatches at the UBC4 rail transition caused recurring twist faults, yet Irish Rail needed a fast, ...

Stabilisation of a road in Reading

Stabilisation of a road in Reading

Road settlement created uneven carriageway levels, affecting ride quality and requiring stabilisation works with minimal traffic disruption on a live ...