Explore our successful projects for road, rail, airport, and port infrastructure, focusing on extending asset life.
Weak and permeable ground conditions threatened the integrity of a flood defence scheme, requiring ground strengthening and reduced permeability ...
Settlement at operational port infrastructure in Peterhead threatened structural performance and required stabilisation without disrupting critical ...
Internal erosion within port structures threatened long‑term stability and durability, requiring ground improvement and seepage control without ...
Badger sett activity within a rail embankment created voids and instability, posing a risk to track support and requiring remediation without ...
Road settlement created uneven carriageway levels, affecting ride quality and requiring stabilisation works with minimal traffic disruption on a live ...
Voids and weakened ground beneath a road bridge abutment threatened stability, requiring strengthening works without disrupting traffic or ...
Ground instability beneath sections of the M61 at Duckworth reduced support to carriageway infrastructure, requiring stabilisation without extended ...
Settlement and voiding beneath the M42 carriageway required remediation to maintain safety and performance while avoiding prolonged closures and high ...
Concrete slab sections on the M42 and M54 experienced loss of support and voiding, requiring stabilisation without extended lane closures or major ...
Voids were identified beneath ground slabs at Lewisham Gateway, compromising support and posing a risk to surface stability in a busy urban ...
Water ingress through a leaking river wall caused voiding and ground instability behind the structure, requiring rapid sealing and stabilisation to ...
Void formation beneath slab track at Kentish Town reduced support and risked track instability, requiring remediation within a live railway ...
To discuss a site issue or arrange a site visit, please get in touch.