Challenge
Settlement beneath stadium terrace structures threatened long‑term stability and required ground improvement within a live sports environment, without disrupting scheduled fixtures.
Solution
Geobear delivered precision geopolymer injection to strengthen underlying ground, stabilise foundations and enable continued stadium use with minimal disruption.
Works coordinated around operational constraints
Injection beneath terrace structures
No large‑scale excavation required
Ground movement beneath terrace areas at Ebbsfleet FC had resulted in localised settlement and reduced support to structural elements.
To safeguard long‑term performance and ensure spectator safety, a ground stabilisation solution was required that could be delivered efficiently within an operational stadium setting.
Traditional excavation and reconstruction would have been disruptive, time‑consuming and impractical within a functioning sports venue.
The programme needed to be carefully managed around site access constraints, with minimal plant footprint and strict safety controls.
Geobear implemented a controlled geopolymer injection programme to improve ground bearing capacity beneath the affected terrace structures.
Small‑diameter injection points were installed to introduce a two‑component geopolymer beneath the foundations. The material expanded on contact, filling voids, densifying loose strata and increasing ground stiffness.
Injection was monitored in real time to ensure uniform improvement and structural protection. The rapid curing properties enabled treated areas to return to service quickly.
Ground stability was restored without intrusive excavation or extended closure.
The works enhanced structural resilience while maintaining operational continuity, providing a durable and low‑carbon alternative to traditional reconstruction.
Don't let unstable ground put your business at risk. Our commercial team can provide a clear assessment and a fast, effective solution tailored to your operational needs.