Keeping critical infrastructure available

Discover how we partner with asset owners and authorities to stabilize roads, airports, railways, and ports. See how our rapid ground improvement solutions extend asset life and ensure safety with zero operational disruption.

Pipe Trench Soil Stabilization

Pipe Trench Soil Stabilization

Geobear ground improvement solution densified the soil and filled voids around the planned excavation, supporting the pump house and preventing ...

Water Pipeline Trench Settlement Repair, Santee CA

Water Pipeline Trench Settlement Repair, Santee CA

Geobear ground improvement solution designed to densify the trench backfill and fill voids beneath the road without excavation or disturbing the ...

Deep injection technique supports city sewer main project

Deep injection technique supports city sewer main project

A Southern California contractor faced challenges replacing a city sewer line in a wet, forested area, where saturated soil threatened to deflect the ...

Precision re-leveling of a Formula 1 track

Precision re-leveling of a Formula 1 track

Severe surface bumps emerged at high-speed sections of an F1 track due to subsurface settlement. Mandatory remediation was required, but strict ...

Public Swimming Pool Ground Stabilisation

Public Swimming Pool Ground Stabilisation

Geobear stabilised soils beneath a Midlands public swimming pool using geopolymer injection. 120 injections completed in 7 days, securing circulation ...

Long Eaton Library Foundation Stabilisation

Long Eaton Library Foundation Stabilisation

Geobear stabilised the front-left corner of Long Eaton Library, a Grade II listed Carnegie building, with geopolymer injection. 25.8 m treated, SPT ...

Historic Building Subsidence

Historic Building Subsidence

Geobear provided a non-invasive, low-impact solution to stabilise the foundations of the historic Campbelltown Registry Office without excavation.

Baker Street Sewer Stabilisation

Baker Street Sewer Stabilisation

Geobear stabilised a failed sewer system in Gorleston with geopolymer injection. Soils at 7.5 m depth improved 3x (SPT 0–1 to 5–15), sinkhole risk ...

Heathrow Terminal 3 Ground Improvement

Heathrow Terminal 3 Ground Improvement

Geobear provided a fast and non-disruptive ground improvement solution for a critical infrastructure project at Heathrow Terminal 3, saving time, ...

Taxiway and Apron Stabilisation

Taxiway and Apron Stabilisation

Geobear treated 58 slabs on a UK airport apron using geopolymer injection. Completed in 11 days, the project prevented future settlement, safeguarded ...

Airfield Concrete Slab Stabilisation

Airfield Concrete Slab Stabilisation

Geobear re-levelled 392 m² of taxiway slabs at a UK airport with geopolymer injection. Up to 50 mm settlement corrected, 27-year design life ...

Superyacht Shipyard Ground Improvement

Superyacht Shipyard Ground Improvement

Geobear stabilised a superyacht dockyard using geopolymer injection. 4.5 m deep injections, 28% bearing capacity increase (DCP verified), and no ...