Keeping critical infrastructure available

Discover how we partner with asset owners and authorities to stabilize roads, airports, railways, and ports. See how our rapid ground improvement solutions extend asset life and ensure safety with zero operational disruption.

Swanage Sea Wall Stabilisation

Swanage Sea Wall Stabilisation

Geobear filled voids behind Swanage’s listed sea wall using 2,160 kg of geopolymer resin. Delivered without excavation or vibration, the scheme ...

Bridport Harbour Wall Stabilisation

Bridport Harbour Wall Stabilisation

Geobear stabilised the harbour wall at West Bay with geopolymer injection to 5 m depth. Voids were filled, stability restored, and works delivered ...

Soft Clay Stabilisation

Soft Clay Stabilisation

Geobear stabilised 600 m² of very soft clay at Kinfauns Drive, Glasgow, using expansive geopolymer injection. Achieved a 780% increase in shear ...

M11 Emergency Ground Strengthening

M11 Emergency Ground Strengthening

Geobear stabilised voided soils at the M11 Jct 14 Girton Interchange with geopolymer injection. Completed in 3 weeks vs 8 weeks excavation, achieving ...

A323 Clay Shrinkage Road Stabilisation

A323 Clay Shrinkage Road Stabilisation

Geobear delivered the UK’s first geopolymer road project on the A323. Shrinkable clay was stabilised to depths of 3.5 m, avoiding excavation and ...

Shugborough Tunnel Void Filling & Lining

Shugborough Tunnel Void Filling & Lining

Geobear filled hidden shafts and lining voids in Shugborough Tunnel with geopolymer injection. Completed in 40 night possessions, delivering a ...

Concrete Railway Level Crossing Stabilisation

Concrete Railway Level Crossing Stabilisation

Geobear stabilised a 90 mph level crossing on the near Swineshead station using geopolymer injection. In one weekend possession, formation stiffness ...

Rail Transition Zone Ground Improvement

Rail Transition Zone Ground Improvement

Geobear stabilised the UBC4 rail transition zone with geopolymer injection. Post-treatment monitoring showed a 59–69% reduction in twist faults and ...

Highways Concrete Bay Stabilisation

Highways Concrete Bay Stabilisation

Geobear stabilised 150 concrete bays on a dual carriageway with geopolymer injection. The scheme cut 326.7 tCO₂e (62% reduction) and was delivered in ...

Have a project you'd like to discuss?

Contact our expert team of engineers to discuss your infrastructure project needs or considerations.

Bear pointing Bear pointing