Challenges
Challenges
Conventional repairs rely on excavation, replacement, and long curing times—often requiring weeks of closures and diversions. The socio-economic cost is huge: on the M11 Girton Interchange, a 9-week full closure would have created £14.8m in indirect costs.
Geobear provides a faster, lower-risk alternative. Our engineered geopolymer is injected through 12–40mm holes to fill voids, compact weak soils, and re-level slabs with millimeter precision. Roads reopen within one hour of treatment, avoiding prolonged disruption.
Road networks face relentless pressures
Heavy dynamic loading from HGVs that overstress pavements not designed for today’s traffic volumes.
Slab settlement, rocking, and pumping, often caused by voiding in poorly compacted subgrades or high water tables.
Reflective cracking in asphalt, driven by joint movement in underlying concrete bays.
Differential settlement at bridge approaches, where poor backfill or voids above pier caps undermine ride quality.
Washout voids from burst mains or water ingress, leaving hidden collapse risks beneath carriageways.
Road networks face relentless pressures:
- Heavy dynamic loading from HGVs that overstress pavements not designed for today’s traffic volumes.
- Slab settlement, rocking, and pumping, often caused by voiding in poorly compacted subgrades or high water tables.
- Reflective cracking in asphalt, driven by joint movement in underlying concrete bays.
- Differential settlement at bridge approaches, where poor backfill or voids above pier caps undermine ride quality.
- Washout voids from burst mains or water ingress, leaving hidden collapse risks beneath carriageways.
Conventional repairs rely on excavation, replacement, and long curing times—often requiring weeks of closures and diversions. The socio-economic cost is huge: on the M11 Girton Interchange, a 9-week full closure would have created £14.8m in indirect costs.
Geobear provides a faster, lower-risk alternative. Our engineered geopolymer is injected through 12–40mm holes to fill voids, compact weak soils, and re-level slabs with millimetre precision. Roads reopen within one hour of treatment, avoiding prolonged disruption.
What Geobear Can Help With
Slab re-levelling
Stabilizing and lifting sunken concrete bays and bridge approaches, restoring smooth and safe ride quality.
Embankment strengthening
Improving ground conditions behind abutments, slopes, and approaches affected by poor compaction or erosion.
Subgrade improvement
Raising the bearing capacity of soils beneath flexible pavements; proven to extend pavement design life by up to 9 years.
Void filling
Filling underground voids caused by washouts, tunnelling, culverts, or animal burrows with expansive, permanent resins.
Case studies
M11 void filling
Using Geobear helped avoid a £1.5m reconstruction and £14.8m in indirect costs, completing the works in 13 night shifts rather than 9 weeks.
Slab stabilization dual carriageway
Geobear completed emergency ground strengthening across a 3.5 km section of dual carriageway
A323 Clay treatment
Clay shrinkage treatment deep beneath pavement to minimize future movement
Geobear solution vs traditional methods
|
Feature |
Geobear Solution |
Traditional Reconstruction |
|
Disruption |
Minimal. Works in overnight possessions; immediate reopening. |
High disruption. Requires full closures and diversions. |
|
Speed |
Completed in hours; roads open in 1 hour. |
Weeks–months with excavation and curing. |
|
Carbon Impact |
Up to 90% lower CO₂ footprint. |
High emissions from excavation, haulage, and concrete. |
|
Precision |
Laser monitoring controls uplift to ±250 microns. |
Less precise; prone to over/under-lifting. |
|
Cost |
Typically 40–60% less, plus major socio-economic savings. |
Expensive and disruptive. |
|
Durability |
Resin life >120 years; proven lifecycle extension. |
Concrete slabs often replaced every 4–10 years. |
Key Benefits of Working with Geobear
Speed & minimal disruption
Geobear design and deliver projects completed within short possessions. The road is handed back and can be used almost immediately.
Life extension
Pavements strengthened to withstand decades of traffic.
Cost savings
50–60% of reconstruction costs, plus avoidance of indirect economic losses.
Sustainable
Up to 75% lower CO₂ impact; inert, hydro-insensitive resins safe even in aquifers.
Trusted partner
Chosen by National Highways, Connect Plus, and leading contractors.
Frequently asked questions