Explore our blog for commercial ground engineering solutions, case studies, and tips to protect your business assets.
Geobear ground improvement solution filled the voids and stabilized the footing and columns, with heavy equipment back on the floor within 48 hours.
A large hanger was suffering from ground settlement resulting in wall and floor cracking
Cracked walls and sticking doors at a San Diego commercial building, linked to loose ground and water ponding beside the perimeter foundations.
Geobear's innovative geopolymer solution provided a fast and effective way to stabilise Hurst Castle and protect it from coastal erosion.
Geobear stabilised the foundations of the historic St Mary's Church with a fast and non-invasive solution, preserving its structural integrity.
Geobear provided a non-invasive, low-impact solution to stabilise the foundations of the historic Campbelltown Registry Office without excavation.
Geobear stabilised a school's foundations with a fast and non-disruptive solution, allowing the contractor to complete the project during a short ...
Geobear provided a fast and non-disruptive ground improvement solution for a critical infrastructure project at Heathrow Terminal 3, saving time, ...
Geobear partnered with a contractor to provide a fast and non-disruptive ground improvement solution for a new building at York St John University.
Geobear provided an insurance company with a fast, economic, and non-disruptive solution for a subsidence claim in Ripon, avoiding costly ...
Geobear provided a BBA-accredited, non-invasive solution to resolve a complex subsidence claim caused by shrinkable clay and tree roots.
Get in touch with us today to ask more, or discuss a project you have in mind.