Our proven infrastructure projects

Explore our successful projects for road, rail, airport, and port infrastructure, focusing on extending asset life.

Highways Concrete Bay Stabilisation

Highways Concrete Bay Stabilisation

Geobear stabilised 150 concrete bays on a dual carriageway with geopolymer injection. The scheme cut 326.7 tCO₂e (62% reduction) and was delivered in ...

Dual Carriageway Ground Improvement Scheme

Dual Carriageway Ground Improvement Scheme

Geobear stabilised 150 concrete bays on a major A-road using geopolymer injection, cutting 326.7 tCO₂e and completing the works in 6 weeks instead of ...

Shugborough Tunnel Void Filling & Lining

Shugborough Tunnel Void Filling & Lining

Geobear filled hidden shafts and lining voids in Shugborough Tunnel with geopolymer injection. Completed in 40 night possessions, delivering a ...

Concrete Railway Level Crossing Stabilisation

Concrete Railway Level Crossing Stabilisation

Geobear stabilised a 90 mph level crossing on the near Swineshead station using geopolymer injection. In one weekend possession, formation stiffness ...

Rail Transition Zone Ground Improvement

Rail Transition Zone Ground Improvement

Geobear stabilised the UBC4 rail transition zone with geopolymer injection. Post-treatment monitoring showed a 59–69% reduction in twist faults and ...

Discuss your site with Geobear

To discuss a site issue or arrange a site visit, please get in touch.

Bear pointing Bear pointing