Explore our successful projects for road, rail, airport, and port infrastructure, focusing on extending asset life.
Geobear stabilised 150 concrete bays on a dual carriageway with geopolymer injection. The scheme cut 326.7 tCO₂e (62% reduction) and was delivered in ...
Geobear stabilised 150 concrete bays on a major A-road using geopolymer injection, cutting 326.7 tCO₂e and completing the works in 6 weeks instead of ...
Geobear filled hidden shafts and lining voids in Shugborough Tunnel with geopolymer injection. Completed in 40 night possessions, delivering a ...
Geobear stabilised a 90 mph level crossing on the near Swineshead station using geopolymer injection. In one weekend possession, formation stiffness ...
Geobear stabilised the UBC4 rail transition zone with geopolymer injection. Post-treatment monitoring showed a 59–69% reduction in twist faults and ...
To discuss a site issue or arrange a site visit, please get in touch.