Impact of clay on infrastructure
This issue impacts all types of infrastructure
Rail
On rail networks the shrink-swell behaviour of high plasticity clays can cause significant differential movement of the sub grade on which the trackbed is constructed. These differences in level caused by the shrink-swell behaviour compromise track stability and alignment causing [track faults] which are significant safety risks. The immediate solution to this are emergency speed restrictions, which lead to long delays and a substantial impact on the operational schedule, which have substantial consequential financial impacts.
Railway Embankment
Railway embankments constructed of reworked high plasticity clay are particularly vulnerable to shrink-swell behaviour, with differential movements not only affecting the sub grade on which the trackbed is constructed but also the slopes of the embankment which can destabilised and degraded by decades of seasonal shrink-swell behaviour.

Buildings and Structures
The foundations of buildings, bridges, bridge abutments, retaining walls, and other critical assets which are cast in high plasticity clays are also at risk from differential ground movement caused by clay shrink-swell behaviour.
Roads
The shrink-swell behaviour of high plasticity clays can also cause differential movement of the sub grade below the pavement construction layers which support roads and highways. This causes loosening and potentially voiding of the previously compacted construction layers; which manifests as cracking of the surface wearing course. This cracking can develop into potholes and other surface defects which can damage vehicles and cause safety hazards. The traditional solution to these defects would be to either patch the road or relay the surface causing major disruption and delays to road users.
Utilities
Buried utilities like water pipes, gas lines, and electrical cables are highly vulnerable to differential ground movement, such as that caused by clay shrink-swell behaviour. The movement, if large enough, can shear pipes and cables, causing leaks, bursts, and widespread service interruptions.
Business & Community Impact
The consequences of clay shrinkage and swelling are profound for infrastructure managers. The likelihood of extreme shrink-swell behaviour of clays soils is linked to high and prolonged soil moisture deficits, which are entirely unpredictable in nature. Consequently, the required repairs to maintain infrastructure integrity are most likely to be unbudgeted. Beyond the financial cost, failures lead to service disruptions that directly impact the community, from traffic jams caused by road closures to travel chaos from rail delays. Unexpected service failures can also pose a serious risk to public safety.
At Geobear, we act as a responsible contracting partner, helping solve these problems without the need for disruptive, time-consuming excavation. Our solutions are up to 70% faster than traditional methods, helping you maintain operations and get infrastructure back in service quickly and safely.
What is Geobear's clay solution?
Geobear's Clay Shrinkage Treatment is an ideal, non-excavation alternative to traditional methods. Instead of constructing new deeper foundations or replacing loosened material above the subgrade by excavation or retamping railway trackbeds, we use geopolymer injection to stabilise the ground from below. Our non-disruptive method has a number of benefits:
Improves the ground
Our geopolymer method stabilizes the clay sub grade on which infrastructure assets are constructed. It does this by reducing the rate at which moisture can be lost from or entering the soil by reducing the bulk permeability. In addition to this it greatly reduces the ability of trees and other plant roots from removing water from the soil.
Is up to 70% faster
Our solutions can be completed in hours or days, not weeks or months. This dramatically reduces downtime, helping you protect your operational integrity.
Has a 75% lower carbon impact
Our approach is significantly more sustainable than digging and replacing soil, helping you meet your environmental commitments.
Offers a wide portfolio of expertise
We have a proven track record as a contracting partner, with our teams and engineering expertise available to support you on projects of any scale. For issues requiring significant load transfer, we also offer a structural support treatment.