Challenge
A tenanted council house in Holbeach was settling on soft, wet silt and clay, with the engineer recommending piled underpinning.
Solution
Geobear ground improvement solution designed to strengthen the softened ground beneath the foundations in two planned shifts, avoiding piled underpinning of an occupied home.
Planned time on site
Level difference at first floor
Existing foundation depth
The property is a three-bedroom semi-detached house on a housing estate in Holbeach, near Spalding in Lincolnshire. It is owned by the local authority, built of load-bearing masonry with timber upper floors, and occupied by council tenants.
After a surveyor noted signs of structural movement, the council commissioned a structural appraisal of this house. The engineer concluded that the house needed underpinning.
The council then issued a tender for underpinning and repairs to the pair of houses, stating that it would consider traditional underpinning or other methods such as injection. Geobear investigated the ground and submitted its proposal.
The structural appraisal recorded a level difference of about 50 mm between the bearing of the first-floor joists on the front wall and on the internal wall. The first-floor finish fell towards the front wall by 13–16 mm over 900 mm, even though it was understood to have been levelled to within 10 mm recently. A stepped crack on the side elevation measured 1.5 mm near the top and 2.5 mm near the bottom, and repointing done at two different times had cracked again. The engineer concluded that the front elevation was moving down and that the settlement was likely to be ongoing and progressive.
Geobear’s own investigation put down two trial pits and two boreholes to 3.2–3.4 m. It found the foundation at 0.87 m, on made ground over firm, very silty clay of intermediate to high plasticity (plasticity index 17–31%) with water contents of 37–47%, and clayey silt that collapsed back in the borehole. In one pit, water was standing 250 mm below ground level because a broken drain was leaking into it.
The conventional alternative was underpinning. Because of the depth needed to reach competent ground and the high water table, the structural engineer advised that traditional mass concrete underpinning would not be enough and a piled solution would be required. The engineer also warned that, as the house is attached, differential movement between the two properties had to be avoided.
Piled underpinning of an occupied semi-detached house means piling rigs, breaking out floors or excavating beside the walls for needle beams, and working below a high water table in saturated sand. The council’s tender asked contractors to say if they considered it safer for the families to be moved out during the works.
A Geobear ground improvement solution strengthens the ground beneath the existing foundations through small drilled holes, with no excavation below the water table.
Geobear designed a ground improvement solution using targeted geopolymer injection to treat the softened clay and silt beneath the strip foundations of the house. The engineering objective was to increase the strength and stiffness of the ground directly below the footings and stop the progressive settlement of the front elevation.
Geobear acted as principal contractor. Before the works, the drains were to be surveyed and repaired, buried services were located and exposed, and CCTV drain monitoring was specified during injection.
The treatment is covered by a 10-year insurance-backed guarantee.
Every home is unique. Our experts are ready to listen and provide answers tailored to your specific property and concerns.