Explore our successful projects for road, rail, airport, and port infrastructure, focusing on extending asset life.
Voids and weakened ground beneath a road bridge abutment threatened stability, requiring strengthening works without disrupting traffic or ...
Ground instability beneath sections of the M61 at Duckworth reduced support to carriageway infrastructure, requiring stabilisation without extended ...
Settlement and voiding beneath the M42 carriageway required remediation to maintain safety and performance while avoiding prolonged closures and high ...
Concrete slab sections on the M42 and M54 experienced loss of support and voiding, requiring stabilisation without extended lane closures or major ...
Voids were identified beneath ground slabs at Lewisham Gateway, compromising support and posing a risk to surface stability in a busy urban ...
Water ingress through a leaking river wall caused voiding and ground instability behind the structure, requiring rapid sealing and stabilisation to ...
Void formation beneath slab track at Kentish Town reduced support and risked track instability, requiring remediation within a live railway ...
Weak and variable ground conditions beneath Tynybryn Bridge required strengthening to ensure long‑term structural stability without extensive ...
Construction of a new sewer beneath a live motorway required ground improvement to ensure stability and load performance without disrupting traffic ...
Weak underlying soils beneath a major A road caused settlement and reduced pavement performance, requiring stabilisation without extended lane ...
Ageing dock infrastructure experienced ground deterioration and loss of support, requiring soil improvement to maintain operational safety without ...
Ground instability and settlement required remediation to protect structural performance, without invasive excavation or prolonged disruption to the ...
To discuss a site issue or arrange a site visit, please get in touch.