Our proven infrastructure projects

Explore our successful projects for road, rail, airport, and port infrastructure, focusing on extending asset life.

Barking substation stabilisation and void filling

Barking substation stabilisation and void filling

Void formation beneath hardstanding at Barking substation risked asset stability and operational resilience, requiring ground improvement without ...

A83 void filling and stabilisation

A83 void filling and stabilisation

Voids beneath the A83 carriageway caused localised instability and safety concerns, requiring rapid ground stabilisation on a key strategic route ...

A55 slab stabilisation

A55 slab stabilisation

Concrete pavement slabs on the A55 had settled due to sub‑base voiding and loss of support, requiring rapid stabilisation without extended closures ...

A180 Croxton Holding scheme

A180 Croxton Holding scheme

Decades‑old A180 concrete slabs were sinking due to sub‑base washout and heavy traffic, degrading ride quality and compromising safety; a fast, ...

A55 J35–J34 Westbound pavement slab stabilisation

A55 J35–J34 Westbound pavement slab stabilisation

Concrete pavement slabs on the A55 westbound between J35 and J34 had settled due to sub‑base washout, requiring rapid stabilisation without extended ...

A47 Bretton Subway, Peterborough

A47 Bretton Subway, Peterborough

Geobear delivered targeted geopolymer injection beneath the affected carriageway to fill voids, improve subgrade strength and re‑level slabs during ...

Rapid pavement stabilisation on the A14

Rapid pavement stabilisation on the A14

Geobear injected expanding geopolymer beneath affected slabs, filling voids, displacing water, and precisely re-levelling the pavement within tightly ...

Public Swimming Pool Ground Stabilisation

Public Swimming Pool Ground Stabilisation

Geobear stabilised soils beneath a Midlands public swimming pool using geopolymer injection. 120 injections completed in 7 days, securing circulation ...

Long Eaton Library Foundation Stabilisation

Long Eaton Library Foundation Stabilisation

Geobear stabilised the front-left corner of Long Eaton Library, a Grade II listed Carnegie building, with geopolymer injection. 25.8 m treated, SPT ...

Historic Building Subsidence

Historic Building Subsidence

Geobear provided a non-invasive, low-impact solution to stabilise the foundations of the historic Campbelltown Registry Office without excavation.

Sewer Pipe Belly Lifting

Sewer Pipe Belly Lifting

Geobear lifted sagging sewer pipes on a new-build estate using geopolymer injection. Five locations treated in 8 days, pipe bellies corrected, no ...

Baker Street Sewer Stabilisation

Baker Street Sewer Stabilisation

Geobear stabilised a failed sewer system in Gorleston with geopolymer injection. Soils at 7.5 m depth improved 3x (SPT 0–1 to 5–15), sinkhole risk ...

Discuss your site with Geobear

To discuss a site issue or arrange a site visit, please get in touch.

Bear pointing Bear pointing