Public Swimming Pool Ground Stabilisation

Public Swimming Pool Ground Stabilisation

Geobear stabilised soils beneath a Midlands public swimming pool using geopolymer injection. 120 injections completed in 7 days, securing circulation ...

Long Eaton Library Foundation Stabilisation

Long Eaton Library Foundation Stabilisation

Geobear stabilised the front-left corner of Long Eaton Library, a Grade II listed Carnegie building, with geopolymer injection. 25.8 m treated, SPT ...

Historic Building Subsidence

Historic Building Subsidence

Geobear provided a non-invasive, low-impact solution to stabilise the foundations of the historic Campbelltown Registry Office without excavation.

Baker Street Sewer Stabilisation

Baker Street Sewer Stabilisation

Geobear stabilised a failed sewer system in Gorleston with geopolymer injection. Soils at 7.5 m depth improved 3x (SPT 0–1 to 5–15), sinkhole risk ...

Heathrow Terminal 3 Ground Improvement

Heathrow Terminal 3 Ground Improvement

Geobear provided a fast and non-disruptive ground improvement solution for a critical infrastructure project at Heathrow Terminal 3, saving time, ...

Taxiway and Apron Stabilisation

Taxiway and Apron Stabilisation

Geobear treated 58 slabs on a UK airport apron using geopolymer injection. Completed in 11 days, the project prevented future settlement, safeguarded ...

Airfield Concrete Slab Stabilisation

Airfield Concrete Slab Stabilisation

Geobear re-levelled 392 m² of taxiway slabs at a UK airport with geopolymer injection. Up to 50 mm settlement corrected, 27-year design life ...

Superyacht Shipyard Ground Improvement

Superyacht Shipyard Ground Improvement

Geobear stabilised a superyacht dockyard using geopolymer injection. 4.5 m deep injections, 28% bearing capacity increase (DCP verified), and no ...

Swanage Sea Wall Stabilisation

Swanage Sea Wall Stabilisation

Geobear filled voids behind Swanage’s listed sea wall using 2,160 kg of geopolymer resin. Delivered without excavation or vibration, the scheme ...

Bridport Harbour Wall Stabilisation

Bridport Harbour Wall Stabilisation

Geobear stabilised the harbour wall at West Bay with geopolymer injection to 5 m depth. Voids were filled, stability restored, and works delivered ...

Soft Clay Stabilisation

Soft Clay Stabilisation

Geobear stabilised 600 m² of very soft clay at Kinfauns Drive, Glasgow, using expansive geopolymer injection. Achieved a 780% increase in shear ...

M11 Emergency Ground Strengthening

M11 Emergency Ground Strengthening

Geobear stabilised voided soils at the M11 Jct 14 Girton Interchange with geopolymer injection. Completed in 3 weeks vs 8 weeks excavation, achieving ...