Apr 28, 2021
Lifecycle extension of concrete roads using geopolymer Geobear recently produced a technical report concerned with geopolymer stabilisation for the ...
Jan 26, 2021
Geobear has started a two-week programme of work to improve the ground beneath a section of the A41 in Aylesbury. Transport for Buckinghamshire ...
Jun 16, 2020
From the traveller routes in the Iron Age to the Roman Empire’s Watling Road, Britain like the rest of the world has relied heavily on its road ...
Jan 27, 2020
The cost of subsidence With the changing climate, the past two years have seen an upsurge in subsidence affecting housing in the UK and this trend ...
Jul 17, 2019
Register now for a lunchtime webinar hosted by Geobear: – August 2, 12:00 noon.
Jun 05, 2019
Changes in soil dynamics and the impact of increased axle loads has gradually degraded our road surfaces. Consequently, both flexible surfaces and ...
Jan 16, 2019
A critical ground improvement and void filling project on the M11 was featured on the BBC News last October. Geobear were the ground engineering ...
Jan 03, 2019
In December Geobear CEO, Otso Lahtinen, joined the New Civil Engineer’s Innovation in Infrastructure Forum in central London.
Nov 03, 2018
Please note this webinar has passed. Please enter your email address below to view a recording.
Nov 22, 2017
Geobear was recently awarded the contract to treat voided soils on behalf of Highways England.
Jul 05, 2017
Geobear were recently on hand to deliver an urgent project at Kentish Town City Farm. The floor of the community farm’s main building was sinking ...
Dec 12, 2016
Geobear stabilises road outside Edinburgh.