Explore our successful projects for road, rail, airport, and port infrastructure, focusing on extending asset life.
Void formation and ground weakening within a highway embankment caused by badger sett activity led to surface settlement and full road closure.
Voids were identified beneath infrastructure at Tunstall Reservoir, posing risks to structural stability and long‑term asset performance in a ...
Rocking concrete slabs caused vibration, operational disruption and safety concerns, requiring stabilisation without removing or replacing the ...
Washout of fines created voids beneath a live wastewater outfall pipe, causing joint settlement, water loss, and environmental risk — requiring rapid ...
Geobear stabilised the UBC4 rail transition zone with geopolymer injection. Post-treatment monitoring showed a 59–69% reduction in twist faults and ...
Geobear stabilised soils beneath a Midlands public swimming pool using geopolymer injection. 120 injections completed in 7 days, securing circulation ...
Geobear stabilised the front-left corner of Long Eaton Library, a Grade II listed Carnegie building, with geopolymer injection. 25.8 m treated, SPT ...
Geobear provided a non-invasive, low-impact solution to stabilise the foundations of the historic Campbelltown Registry Office without excavation.
Geobear stabilised soils beneath a pumping station in Renfrew using dewatering, void filling, and geopolymer injection. 14 ejector wells (17 m deep), ...
Geobear lifted sagging sewer pipes on a new-build estate using geopolymer injection. Five locations treated in 8 days, pipe bellies corrected, no ...
To discuss a site issue or arrange a site visit, please get in touch.