Challenge

Cracking and damaged support posts along the east wall of a Long Beach warehouse, attributed to ground weakened by suspected pipe leaks.

Solution

Geobear foundation stabilization solution: targeted ground improvement beneath 276 linear feet of foundation wall, without excavation.

276 ft

Foundation wall treated

10 days

Start to finish

Background

The affected building is a commercial building in Long Beach, California, divided into six hangar bays along its street frontage.

It stands beside an airfield apron where aircraft and ground equipment are moved.

The client asked Geobear to stabilize the foundation along the east side of the building, where damage had developed.

Geobear’s engineers identified that leaking pipes were the primary cause .

Water leaking into made ground can soften the soil and carry fine particles away, which reduces the support the foundation receives. 

Challenge

Symptoms. Ccracking along the east wall and damage to support posts or beams. 

Ground conditions. Geobear’s determined that the ground beneath the foundation is made ground, meaning placed fill rather than natural soil, and that the foundation is about 8 feet deep.

DCP (dynamic cone penetrometer) testing was included, with two test locations marked on the treatment plan, but no results were available.

Solution

The principal conventional alternative is underpinning: excavating beneath the existing foundation in sections and extending it to deeper bearing ground, or installing push piers or helical piles along the wall.

With a foundation about 8 feet deep, electrical, gas and water services marked along the wall, and a working apron beside the building, that approach would involve deep excavation and temporary support next to those services, followed by reinstatement of the surfaces.

Geobear designed a foundation stabilization solution that treats the weak ground in place, working through the existing foundation instead of excavating alongside it. 

Close up view of ground settlement cracks in a concrete slab

 

Results

Geobear designed a foundation stabilization and ground improvement solution using targeted geopolymer injection along 276 linear feet of the building’s east-side foundation.