Business

Hotel parking lot restored in just 3 days

Challenge

A historic five-star Dutch inn in Santa Ynez Valley faced parking lot settlement caused by unsealed concrete joints. Water seeped under the slabs, leading to cracking, pooling, and accelerated damage.

Solution

The inn considered replacing the concrete slabs, a costly, disruptive process that would shut down the parking lot for weeks. Instead, Geobear provided a non-invasive solution, injecting geopolymer to lift and stabilize the slabs in under three days with minimal disruption.

68+

Total guest rooms that didn't need to reschedule their travel

3 Days

Less than three days to complete repairs and get back to normal

30%

Reduction in total repair cost over alternative solutions

Background

Our client is a historic five-star Dutch inn in the Santa Ynez Valley. With 68 rooms and three spa suites, the property is a quaint and charming location for guests looking to enjoy the beautiful grounds, spa, pool, wine tastings, and dining.

Challenge

The parking lot was experiencing settlement due to unsealed joints between the concrete panels. The unsealed joints were allowing water under the slabs and undermining the slabs. Eventually, this led to fracturing of the slabs and pooling of water that was accelerating the settlement and causing further damage.

Our team was able to create a non-invasive treatment plan that would not disrupt their operations or cost them weeks of revenue. In less than 3 working days, we were able to inject geopolymer into the settled area.

Solutions

The client initially considered demolishing the concrete slabs and having the slabs replaced. This would have been a costly and invasive process involving large crews and cement trucks disrupting the grounds. The parking lot would have been shut down for weeks in the process – impacting business and revenue at the hotel.

Before committing to replacing all of the slabs, they chose to call Geobear. Our team was able to create a non-invasive treatment plan that would not disrupt their operations or cost them weeks of revenue. In less than 3 working days, we were able to inject geopolymer into the settled area. This lifted the settled areas back to their original position and filled any voids under the slabs.

Results

Geobear’s expert technicians were able to restore the damage created by the unsealed joints in just days, compared to several weeks required for the “traditional” solution. Geobear’s proprietary geopolymer injection method not only eliminated dangerous trip hazards but also helped to prevent future pooling.

The client was able to solve the problem at a fraction of the price with no business disruption or lost revenue. Once our team’s work was complete, the client was able to handle the cosmetic repairs and sealing of joints with minimal disruption and cost.

Discuss your project with an expert

Don't let unstable ground put your business at risk. Our commercial team can provide a clear assessment and a fast, effective solution tailored to your operational needs.

Bear pointing Bear pointing