---
title: US - Taxiway and Apron Stabilization
description: Geobear treated 58 slabs on a UK airport apron using geopolymer injection. Completed in 11 days, the project prevented future settlement, safeguarded operations, and avoided the cost and disruption of slab reconstruction.
---

[Case Studies - Infrastructure ](https://www.geobear.com/en-us/infrastructure/references)

# [US - Taxiway and Apron Stabilization](https://www.geobear.com/en-us/infrastructure/references/taxiway-apron-slab-stabilisation)

 Written by [Brian Jones](https://www.geobear.com/en-us/infrastructure/references/author/brian-jones) | Dec 15, 2025 1:19:32 PM

[View full post](https://www.geobear.com/en-us/infrastructure/references/taxiway-apron-slab-stabilisation)

```json
{
  "@context" : "http://schema.org",
  "@type" : "BlogPosting",
  "author" : {
    "@type" : "Person",
    "name" : "Brian Jones"
  },
  "dateModified" : "2025-12-15T13:19:32.249Z",
  "datePublished" : "2025-12-15T13:19:32Z",
  "headline" : "US - Taxiway and Apron Stabilization",
  "image" : {
    "@type" : "ImageObject",
    "height" : 900,
    "url" : "https://144453750.fs1.hubspotusercontent-eu1.net/hubfs/144453750/Taxiway%20stabilisation%20luton%20slab%20issue.jpg",
    "width" : 1600
  },
  "mainEntityOfPage" : "https://www.geobear.com/en-us/infrastructure/references/taxiway-apron-slab-stabilisation",
  "publisher" : {
    "@type" : "Organization",
    "logo" : {
      "@type" : "ImageObject",
      "height" : 60,
      "url" : "/hs/hsstatic/content_shared_assets/static-1.4092/img/default-amp-logo.png",
      "width" : 60
    },
    "name" : "Case Studies - Infrastructure"
  }
}
```