---
title: US - Running Sand Cofferdam Stabilization for United Utilities | Geobear
description: Geobear stabilized running sand that prevented cofferdam construction for United Utilities. Completed in one week with zero disruption, enabling Ward & Burke to continue deep excavation safely and on time.
---

[Case Studies - Infrastructure ](https://www.geobear.com/en-us/infrastructure/references)

# [US - Running Sand Cofferdam Stabilization for United Utilities | Geobear](https://www.geobear.com/en-us/infrastructure/references/running-sand-cofferdam-stabilisation-for-united-utilities-geobear)

 Written by [Brian Jones](https://www.geobear.com/en-us/infrastructure/references/author/brian-jones) | Dec 15, 2025 1:20:04 PM

[View full post](https://www.geobear.com/en-us/infrastructure/references/running-sand-cofferdam-stabilisation-for-united-utilities-geobear)

```json
{
  "@context" : "http://schema.org",
  "@type" : "BlogPosting",
  "author" : {
    "@type" : "Person",
    "name" : "Brian Jones"
  },
  "dateModified" : "2025-12-15T13:20:04.078Z",
  "datePublished" : "2025-12-15T13:20:04Z",
  "headline" : "US - Running Sand Cofferdam Stabilization for United Utilities | Geobear",
  "image" : {
    "@type" : "ImageObject",
    "height" : 901,
    "url" : "https://144453750.fs1.hubspotusercontent-eu1.net/hubfs/144453750/UK/UK%20Infa/Infra%20challenges%20water%20seal%20cofferdam%20.jpeg",
    "width" : 1600
  },
  "mainEntityOfPage" : "https://www.geobear.com/en-us/infrastructure/references/running-sand-cofferdam-stabilisation-for-united-utilities-geobear",
  "publisher" : {
    "@type" : "Organization",
    "logo" : {
      "@type" : "ImageObject",
      "height" : 60,
      "url" : "/hs/hsstatic/content_shared_assets/static-1.4092/img/default-amp-logo.png",
      "width" : 60
    },
    "name" : "Case Studies - Infrastructure"
  }
}
```