title: US - Highways concrete bay stabilization
description: Geobear stabilized 150 concrete bays on a dual carriageway with geopolymer injection. The scheme cut 326.7 tCO₂e (62% reduction) and was delivered in 6 weeks vs 5–10 months for reconstruction.
---

[Case Studies - Infrastructure ](https://www.geobear.com/en-us/infrastructure/references)

# [US - Highways concrete bay stabilization](https://www.geobear.com/en-us/infrastructure/references/highways-concrete-bay-stabilisation)

 Written by [Brian Jones](https://www.geobear.com/en-us/infrastructure/references/author/brian-jones) | Dec 15, 2025 1:20:05 PM

[View full post](https://www.geobear.com/en-us/infrastructure/references/highways-concrete-bay-stabilisation)

```json
{
  "@context" : "http://schema.org",
  "@type" : "BlogPosting",
  "author" : {
    "@type" : "Person",
    "name" : "Brian Jones"
  },
  "dateModified" : "2025-12-15T13:20:05.163Z",
  "datePublished" : "2025-12-15T13:20:05Z",
  "headline" : "US - Highways concrete bay stabilization",
  "image" : {
    "@type" : "ImageObject",
    "height" : 901,
    "url" : "https://144453750.fs1.hubspotusercontent-eu1.net/hubfs/144453750/A10-planning.jpg",
    "width" : 1601
  },
  "mainEntityOfPage" : "https://www.geobear.com/en-us/infrastructure/references/highways-concrete-bay-stabilisation",
  "publisher" : {
    "@type" : "Organization",
    "logo" : {
      "@type" : "ImageObject",
      "height" : 60,
      "url" : "/hs/hsstatic/content_shared_assets/static-1.4092/img/default-amp-logo.png",
      "width" : 60
    },
    "name" : "Case Studies - Infrastructure"
  }
}
```