---
title: Rapid pavement stabilisation on the A14 | Geobear highway case study
description: Geobear stabilised uneven concrete slabs on A14 using geopolymer, restoring a safe road surface with minimal disruption and reopening within 30 minutes.
---

[Our infrastructure projects | Geobear ](https://www.geobear.com/en-gb/infrastructure/references)

# [Rapid pavement stabilisation on the A14 | Geobear highway case study](https://www.geobear.com/en-gb/infrastructure/references/rapid-pavement-stabilisation-on-the-a14-geobear-highway-case-study)

 Written by [Paul Garthwaite](https://www.geobear.com/en-gb/infrastructure/references/author/paul-garthwaite) | Dec 23, 2025 9:47:23 AM

[View full post](https://www.geobear.com/en-gb/infrastructure/references/rapid-pavement-stabilisation-on-the-a14-geobear-highway-case-study)

```json
{
  "@context" : "http://schema.org",
  "@type" : "BlogPosting",
  "author" : {
    "@type" : "Person",
    "name" : "Paul Garthwaite"
  },
  "dateModified" : "2025-12-23T09:49:43.291Z",
  "datePublished" : "2025-12-23T09:47:23Z",
  "headline" : "Rapid pavement stabilisation on the A14 | Geobear highway case study",
  "image" : {
    "@type" : "ImageObject",
    "height" : 479,
    "url" : "https://144453750.fs1.hubspotusercontent-eu1.net/hubfs/144453750/UK/UK%20Infa/Case%20studies/Haughey%20copy.jpg",
    "width" : 1030
  },
  "mainEntityOfPage" : "https://www.geobear.com/en-gb/infrastructure/references/rapid-pavement-stabilisation-on-the-a14-geobear-highway-case-study",
  "publisher" : {
    "@type" : "Organization",
    "logo" : {
      "@type" : "ImageObject",
      "height" : 60,
      "url" : "/hs/hsstatic/content_shared_assets/static-1.4092/img/default-amp-logo.png",
      "width" : 60
    },
    "name" : "Case Studies - Infrastructure"
  }
}
```