---
title: Highways concrete bay stabilisation | Geobear UK
description: Geobear stabilised 150 concrete bays on a dual carriageway with geopolymer injection. The scheme cut 326.7 tCO₂e (62% reduction).
---

[Our infrastructure projects | Geobear ](https://www.geobear.com/en-gb/infrastructure/references)

# [Highways concrete bay stabilisation | Geobear UK](https://www.geobear.com/en-gb/infrastructure/references/highways-concrete-bay-stabilisation)

 Written by [Paul Garthwaite](https://www.geobear.com/en-gb/infrastructure/references/author/paul-garthwaite) | Oct 30, 2025 5:55:25 PM

[View full post](https://www.geobear.com/en-gb/infrastructure/references/highways-concrete-bay-stabilisation)

```json
{
  "@context" : "http://schema.org",
  "@type" : "BlogPosting",
  "author" : {
    "@type" : "Person",
    "name" : "Paul Garthwaite"
  },
  "dateModified" : "2025-12-23T09:23:15.542Z",
  "datePublished" : "2025-10-30T17:55:25Z",
  "headline" : "Highways concrete bay stabilisation | Geobear UK",
  "image" : {
    "@type" : "ImageObject",
    "height" : 901,
    "url" : "https://144453750.fs1.hubspotusercontent-eu1.net/hubfs/144453750/A10-planning.jpg",
    "width" : 1601
  },
  "mainEntityOfPage" : "https://www.geobear.com/en-gb/infrastructure/references/highways-concrete-bay-stabilisation",
  "publisher" : {
    "@type" : "Organization",
    "logo" : {
      "@type" : "ImageObject",
      "height" : 60,
      "url" : "/hs/hsstatic/content_shared_assets/static-1.4092/img/default-amp-logo.png",
      "width" : 60
    },
    "name" : "Case Studies - Infrastructure"
  }
}
```