---
title: Airport Concrete Slab Stabilisation
description: Geobear re-levelled 392 m² of taxiway slabs at a UK airport with geopolymer injection. Up to 50 mm settlement corrected, 27-year design life achieved, and 46% lower CO₂ vs cementitious grout.
---

[Our infrastructure projects | Geobear ](https://www.geobear.com/en-gb/infrastructure/references)

# [Airport Concrete Slab Stabilisation](https://www.geobear.com/en-gb/infrastructure/references/airport-concrete-slab-stabilisation)

 Written by [Aleister Willis](https://www.geobear.com/en-gb/infrastructure/references/author/aleister-willis) | Oct 30, 2025 5:54:26 PM

[View full post](https://www.geobear.com/en-gb/infrastructure/references/airport-concrete-slab-stabilisation)

```json
{
  "@context" : "http://schema.org",
  "@type" : "BlogPosting",
  "author" : {
    "@type" : "Person",
    "name" : "Aleister Willis"
  },
  "dateModified" : "2025-12-03T13:27:34.958Z",
  "datePublished" : "2025-10-30T17:54:26Z",
  "headline" : "Airport Concrete Slab Stabilisation",
  "image" : {
    "@type" : "ImageObject",
    "height" : 435,
    "url" : "https://144453750.fs1.hubspotusercontent-eu1.net/hubfs/144453750/Airport-injections.jpg",
    "width" : 773
  },
  "mainEntityOfPage" : "https://www.geobear.com/en-gb/infrastructure/references/airport-concrete-slab-stabilisation",
  "publisher" : {
    "@type" : "Organization",
    "logo" : {
      "@type" : "ImageObject",
      "height" : 60,
      "url" : "/hs/hsstatic/content_shared_assets/static-1.4092/img/default-amp-logo.png",
      "width" : 60
    },
    "name" : "Case Studies - Infrastructure"
  }
}
```