---
title: A180 Croxton Holding scheme | Geobear UK highway solutions
description: Geopolymer injection stabilised A180 Croxton slabs by filling voids & lifting settled concrete, improving ride quality & safety with minimal disruption.
---

[Our infrastructure projects | Geobear ](https://www.geobear.com/en-gb/infrastructure/references)

# [A180 Croxton Holding scheme | Geobear UK highway solutions](https://www.geobear.com/en-gb/infrastructure/references/a180-croxton-holding-scheme)

 Written by [Steve Farr](https://www.geobear.com/en-gb/infrastructure/references/author/steve-farr) | Feb 16, 2026 12:12:07 PM

[View full post](https://www.geobear.com/en-gb/infrastructure/references/a180-croxton-holding-scheme)

```json
{
  "@context" : "http://schema.org",
  "@type" : "BlogPosting",
  "author" : {
    "@type" : "Person",
    "name" : "Steve Farr"
  },
  "dateModified" : "2026-02-16T12:15:50.163Z",
  "datePublished" : "2026-02-16T12:12:07Z",
  "headline" : "A180 Croxton Holding scheme | Geobear UK highway solutions",
  "image" : {
    "@type" : "ImageObject",
    "height" : 60,
    "url" : "/hs/hsstatic/content_shared_assets/static-1.4092/img/default-amp-logo.png",
    "width" : 60
  },
  "mainEntityOfPage" : "https://www.geobear.com/en-gb/infrastructure/references/a180-croxton-holding-scheme",
  "publisher" : {
    "@type" : "Organization",
    "logo" : {
      "@type" : "ImageObject",
      "height" : 60,
      "url" : "/hs/hsstatic/content_shared_assets/static-1.4092/img/default-amp-logo.png",
      "width" : 60
    },
    "name" : "Case Studies - Infrastructure"
  }
}
```