---
title: Railway level crossing stabilization case study | Geobear UAE
description: Geobear stabilised a 90 mph level crossing on the near Swineshead station using geopolymer injection. In one weekend possession, formation stiffness was significantly increased, ensuring safe operation until renewal and cutting carbon compared with excavation.
---

[Case Studies - Infrastructure ](https://www.geobear.com/en-ae/infrastructure/references)

# [Railway level crossing stabilization case study | Geobear UAE](https://www.geobear.com/en-ae/infrastructure/references/concrete-railway-level-crossing-stabilization)

 Written by [Dr. Mohamed Wehbi](https://www.geobear.com/en-ae/infrastructure/references/author/mohamed-wehbi) | Dec 15, 2025 12:19:43 PM

[View full post](https://www.geobear.com/en-ae/infrastructure/references/concrete-railway-level-crossing-stabilization)

```json
{
  "@context" : "http://schema.org",
  "@type" : "BlogPosting",
  "author" : {
    "@type" : "Person",
    "name" : "Dr. Mohamed Wehbi"
  },
  "dateModified" : "2025-12-15T12:19:43.390Z",
  "datePublished" : "2025-12-15T12:19:43Z",
  "headline" : "Railway level crossing stabilization case study | Geobear UAE",
  "image" : {
    "@type" : "ImageObject",
    "height" : 900,
    "url" : "https://144453750.fs1.hubspotusercontent-eu1.net/hubfs/144453750/UK/UK%20Infa/Case%20studies/Level-crossing.jpg",
    "width" : 1600
  },
  "mainEntityOfPage" : "https://www.geobear.com/en-ae/infrastructure/references/concrete-railway-level-crossing-stabilization",
  "publisher" : {
    "@type" : "Organization",
    "logo" : {
      "@type" : "ImageObject",
      "height" : 60,
      "url" : "/hs/hsstatic/content_shared_assets/static-1.4092/img/default-amp-logo.png",
      "width" : 60
    },
    "name" : "Case Studies - Infrastructure"
  }
}
```