---
title: Airport manhole repair case study | Al Maktoum International Airport
description: See how Geobear lifted a depressed manhole at Al Maktoum International Airport. 60mm lift achieved in just 3 hours with zero operational disruption.
---

[Case Studies - Infrastructure ](https://www.geobear.com/en-ae/infrastructure/references)

# [Airport manhole repair case study | Al Maktoum International Airport](https://www.geobear.com/en-ae/infrastructure/references/airport-manhole-repair-al-maktoum-international-airport)

 Written by [Dr. Mohamed Wehbi](https://www.geobear.com/en-ae/infrastructure/references/author/mohamed-wehbi) | Dec 15, 2025 12:20:59 PM

[View full post](https://www.geobear.com/en-ae/infrastructure/references/airport-manhole-repair-al-maktoum-international-airport)

```json
{
  "@context" : "http://schema.org",
  "@type" : "BlogPosting",
  "author" : {
    "@type" : "Person",
    "name" : "Dr. Mohamed Wehbi"
  },
  "dateModified" : "2026-04-17T11:51:06.670Z",
  "datePublished" : "2025-12-15T12:20:59Z",
  "headline" : "Airport manhole repair case study | Al Maktoum International Airport",
  "image" : {
    "@type" : "ImageObject",
    "height" : 563,
    "url" : "https://144453750.fs1.hubspotusercontent-eu1.net/hubfs/144453750/AE/AE%20Comm/Case%20studies/Al%20Maktoum%20airport%201.jpg",
    "width" : 1000
  },
  "mainEntityOfPage" : "https://www.geobear.com/en-ae/infrastructure/references/airport-manhole-repair-al-maktoum-international-airport",
  "publisher" : {
    "@type" : "Organization",
    "logo" : {
      "@type" : "ImageObject",
      "height" : 60,
      "url" : "/hs/hsstatic/content_shared_assets/static-1.4092/img/default-amp-logo.png",
      "width" : 60
    },
    "name" : "Case Studies - Infrastructure"
  }
}
```