Explore our successful projects for road, rail, airport, and port infrastructure, focusing on extending asset life.
Geobear stabilised 600 m² of very soft clay at Kinfauns Drive, Glasgow, using expansive geopolymer injection. Achieved a 780% increase in shear ...
Geobear stabilised voided soils at the M11 Jct 14 Girton Interchange with geopolymer injection. Completed in 3 weeks vs 8 weeks excavation, achieving ...
Geobear delivered the UK’s first geopolymer road project on the A323. Shrinkable clay was stabilised to depths of 3.5 m, avoiding excavation and ...
Geobear stabilised 150 concrete bays on a dual carriageway with geopolymer injection. The scheme cut 326.7 tCO₂e (62% reduction) and was delivered in ...
Geobear filled hidden shafts and lining voids in Shugborough Tunnel with geopolymer injection. Completed in 40 night possessions, delivering a ...
Geobear stabilised a 90 mph level crossing on the near Swineshead station using geopolymer injection. In one weekend possession, formation stiffness ...
Geobear stabilised the UBC4 rail transition zone with geopolymer injection. Post-treatment monitoring showed a 59–69% reduction in twist faults and ...
To discuss a site issue or arrange a site visit, please get in touch.